(Created page with "{{Infobox project |image=LasVegasConventionCenterLoop.jpeg |imagecaption=Las Vegas Convention Center Loop |team-members=The Boring Company |location_city=Las vegas NV |status=...") |
No edit summary |
||
Line 5: | Line 5: | ||
|location_city=Las vegas NV | |location_city=Las vegas NV | ||
|status=Launched | |status=Launched | ||
|updated=2022-03-12 | |||
|sector=Transportation | |sector=Transportation | ||
|tag=Mobility Hub | |||
|summary=The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. | |summary=The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. | ||
}} | }} |
Revision as of 04:46, March 13, 2022
Boring Company Las Vegas Convention Center Loop | |
---|---|
Las Vegas Convention Center Loop | |
Team Organizations | The Boring Company |
Point of Contact | |
Participating Municipalities | Las vegas NV |
Sectors | Transportation |
Status | Launched |
Last Updated | November 22, 2024 |
Summary
The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes.