Boring Company Las Vegas Convention Center Loop

From OpenCommons
Jump to navigation Jump to search



Boring Company Las Vegas Convention Center Loop
LasVegasConventionCenterLoop.jpeg
Las Vegas Convention Center Loop
Team Organizations The Boring Company
Point of Contact Wilfred Pinfold
Participating Municipalities Las Vegas NV
Sectors Transportation
Initiative
Status Launched
Last Updated December 22, 2024

Summary

The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes.

Las Vegas Convention Center Loop Map

Website