Boring Company Las Vegas Convention Center Loop: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
|team-members=The Boring Company | |team-members=The Boring Company | ||
|poc=Wilfred Pinfold | |poc=Wilfred Pinfold | ||
|location_city=Las | |location_city=Las Vegas NV | ||
|status=Launched | |status=Launched | ||
|sector=Transportation | |sector=Transportation | ||
| | |chapter=Mobility Hubs | ||
|summary=The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. | |summary=The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. | ||
|updated=2022-03-12 | |||
|tag=Mobility Hubs | |||
}} | }} | ||
LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes. | LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes. |
Latest revision as of 04:35, January 17, 2023
Boring Company Las Vegas Convention Center Loop | |
---|---|
Las Vegas Convention Center Loop | |
Team Organizations | The Boring Company |
Point of Contact | Wilfred Pinfold |
Participating Municipalities | Las Vegas NV |
Sectors | Transportation |
Status | Launched |
Last Updated | November 22, 2024 |
Summary
The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes.