Abuja City Integrated Transportation System: Difference between revisions

From OpenCommons
Jump to navigation Jump to search
en>Ocadmin
No edit summary
 
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{ActionCluster
{{ActionCluster
 
|image=AbujaCitySmartTransport.jpg
| title            = Abuja City Integrated Transportation System
|team=NITDA
 
|leader=Bern Ewah
| team             = NITDA
|imagecaption=Abuja City
 
|municipalities=Abuja Nigeria
<!-- | leader            = [mailto:bewah@nitda.gov.ng Bernard Weich] -->
|status=Concept only Stage
| leader           = Bernard Weich
|description=Sustainable Mass Abuja Rapid Transit (SMART) is an easier, efficient and seamless means of utilizing the city’s public mass transit bus service.  
| email            = bewah@nitda.gov.ng
| image            = AbujaCity.jpg
| imagecaption     = Abuja City
| municipalities   = Abuja City, Nigeria
 
 
| status           = Concept only Stage
| website          =
| download          =
 
| description       =  
Sustainable Mass Abuja Rapid Transit (SMART) is an easier, efficient and seamless means of utilizing the city’s public mass transit bus service.  
Abuja Urban Mass Transit has over 500 buses conveying an estimated 1000 passengers daily. The proposed project will equip 100 buses with devices to generate and transmit real time data and information between drivers, commuters, city transport officials and the general public.  
Abuja Urban Mass Transit has over 500 buses conveying an estimated 1000 passengers daily. The proposed project will equip 100 buses with devices to generate and transmit real time data and information between drivers, commuters, city transport officials and the general public.  
The project targets increased ridership and revenue generation from the combination of multiple methods of electronic payments, bus routing, location tracking as well as online bus schedule service.  
The project targets increased ridership and revenue generation from the combination of multiple methods of electronic payments, bus routing, location tracking as well as online bus schedule service.
 
|challenges=* It is difficult to Track the physical location of the Buses.
 
| challenges       =  
* It is difficult to Track the physical location of the Buses.
* Provision of instant ticketing for more effective payment collection
* Provision of instant ticketing for more effective payment collection
* It is difficult to collect data (such as passenger counts).
* It is difficult to collect data (such as passenger counts).
* Lack Capacity and manpower on maintenance and simple troubleshooting of installed systems
* Lack Capacity and manpower on maintenance and simple troubleshooting of installed systems
* Bus routes poorly connected as a result of which efficiency is not measurable
* Bus routes poorly connected as a result of which efficiency is not measurable
 
|solutions=TBD
 
|requirements=* Feasibility studies (needs assessment) and planning
 
| solutions             =  
 
 
| requirements       =  
* Feasibility studies (needs assessment) and planning
* Implementation:  
* Implementation:  
# Deploy automatic payment system on the bus
# Deploy automatic payment system on the bus
Line 45: Line 24:
* Testing  
* Testing  
* Commissioning  
* Commissioning  
* Capacity Building  
* Capacity Building
 
|kpi=* Amount of money generated per day increase by 20%
 
 
 
| kpi               =  
* Amount of money generated per day increase by 20%
* Life cycle of the Bus increase by 20% as a result of designated bus route.
* Life cycle of the Bus increase by 20% as a result of designated bus route.
* Road hazard decrease by 80% (Drivers assessment)  
* Road hazard decrease by 80% (Drivers assessment)  
Line 58: Line 32:
* Air pollution reduction by 30%
* Air pollution reduction by 30%
* Traffic jam reduction by 50%
* Traffic jam reduction by 50%
 
|measurement=* Effective use of e-payment system
 
 
| measurement       =  
* Effective use of e-payment system
* Tracking to collect vital information for better maintenance and service
* Tracking to collect vital information for better maintenance and service
* Special training and onboard camera  
* Special training and onboard camera  
Line 70: Line 40:
* Progress Report documented and published
* Progress Report documented and published
* Monitoring and enforcement
* Monitoring and enforcement
 
|standards=* Standards and guidelines on road usage
 
| standards         =
* Standards and guidelines on road usage
* Standards and guidelines on software deployment  
* Standards and guidelines on software deployment  
* Guidelines on Data Protection
* Guidelines on Data Protection
Line 79: Line 46:
* Development of Urban Mass Transit Framework
* Development of Urban Mass Transit Framework
* Adoption of Public Private Partnership (PPP) Model
* Adoption of Public Private Partnership (PPP) Model
* Better Incentives  
* Better Incentives
 
|cybersecurity=TBD
 
|impacts=* Job Creation (100 – 500 direct and indirect estimated)
| cybersecurity         =  
 
 
 
| impacts                 =  
* Job Creation (100 – 500 direct and indirect estimated)
* Wealth Creation (new business would be established)  
* Wealth Creation (new business would be established)  
* Increase revenue collection for FCTA (about 5million)
* Increase revenue collection for FCTA (about 5million)
Line 98: Line 59:
* Provide information to customers in real-time.
* Provide information to customers in real-time.
* Enhanced security and emergency response.
* Enhanced security and emergency response.
 
|demonstration=Phase I Pilot:
 
 
 
 
| demonstration       =
Phase I Pilot:
* Feasibility and Planning and deployment  
* Feasibility and Planning and deployment  
* Implementation  
* Implementation  
Line 111: Line 66:
* Testing
* Testing
* Commissioning  
* Commissioning  
* Capacity Building  
* Capacity Building
 
|chapter=Intelligent Transportation
| supercluster           = Transportation
|supercluster=Transportation
| year                   = 2016
|year=2016
 
|title=Abuja City Integrated Transportation System
|email=bewah@nitda.gov.ng
}}
}}
[[File:AbujaCity.jpg|600px|center|Abuja City Integrated Transportation System]]

Latest revision as of 20:19, January 24, 2023


Abuja City Integrated Transportation System
GCTC logo 344x80.png
AbujaCitySmartTransport.jpg
Abuja City
Team Organizations NITDA
Team Leaders Bern Ewah
Participating Municipalities Abuja Nigeria
Status Concept only Stage
Document None

Description

Sustainable Mass Abuja Rapid Transit (SMART) is an easier, efficient and seamless means of utilizing the city’s public mass transit bus service. Abuja Urban Mass Transit has over 500 buses conveying an estimated 1000 passengers daily. The proposed project will equip 100 buses with devices to generate and transmit real time data and information between drivers, commuters, city transport officials and the general public. The project targets increased ridership and revenue generation from the combination of multiple methods of electronic payments, bus routing, location tracking as well as online bus schedule service.

Challenges

  • It is difficult to Track the physical location of the Buses.
  • Provision of instant ticketing for more effective payment collection
  • It is difficult to collect data (such as passenger counts).
  • Lack Capacity and manpower on maintenance and simple troubleshooting of installed systems
  • Bus routes poorly connected as a result of which efficiency is not measurable

Solutions

TBD

Major Requirements

  • Feasibility studies (needs assessment) and planning
  • Implementation:
  1. Deploy automatic payment system on the bus
  2. Install tracking device and camera for transit control
  3. Develop ASUMTS Live suite tool (web portal and mobile app)
  4. Install passenger counter device.
  5. Install Automated stop announcement
  • Testing
  • Commissioning
  • Capacity Building

Performance Targets

Key Performance Indicators (KPIs) Measurement Methods
  • Amount of money generated per day increase by 20%
  • Life cycle of the Bus increase by 20% as a result of designated bus route.
  • Road hazard decrease by 80% (Drivers assessment)
  • Big data analysis for better planning and service expansion
  • Time Management should be improve by 50%
  • Air pollution reduction by 30%
  • Traffic jam reduction by 50%
  • Effective use of e-payment system
  • Tracking to collect vital information for better maintenance and service
  • Special training and onboard camera
  • From ticket purchase and passenger tracking
  • Bus stop frequency tracking
  • Improve incentives, orderliness and frequency of public transport
  • Progress Report documented and published
  • Monitoring and enforcement

Standards, Replicability, Scalability, and Sustainability

  • Standards and guidelines on road usage
  • Standards and guidelines on software deployment
  • Guidelines on Data Protection
  • Standards and guidelines on environmental protection
  • Development of Urban Mass Transit Framework
  • Adoption of Public Private Partnership (PPP) Model
  • Better Incentives

Cybersecurity and Privacy

TBD

Impacts

  • Job Creation (100 – 500 direct and indirect estimated)
  • Wealth Creation (new business would be established)
  • Increase revenue collection for FCTA (about 5million)
  • Increase economic activities
  • Reduce traffic congestions
  • Reduce Carbon (CO2) emission
  • Reduce accident
  • Improve public transit reliability, accessibility, predictability and safety.
  • Improve collection of data (such as passenger counts) that assists transit planners when designing service are made possible.
  • Provide information to customers in real-time.
  • Enhanced security and emergency response.

Demonstration/Deployment

Phase I Pilot:

  • Feasibility and Planning and deployment
  • Implementation

Phase II Deployment:

  • Testing
  • Commissioning
  • Capacity Building
Abuja City Integrated Transportation System