CHAOS Report on IT Project Outcomes

From OpenCommons
Jump to navigation Jump to search

Historical (1994)

In the original Standish Group survey, only 16.2% of software projects were delivered on-time and on-budget [1]. Meanwhile 31.1% were canceled before completion [1]. Budget overruns were massive: over half (52.7%) of projects ran 189% over the original cost estimate [1]. Large organizations fared worst – only 9% of their projects succeeded, with 61.5% challenged and 29.5% canceled [1]. Even completed projects delivered far less than planned: projects in large firms averaged only 42% of their original features [1]. Overall, across 3,682 projects in that sample, only 12% were on-time and on-budget [1] Standish Group 1994]).

“CHAOS Manifesto” (2012)

By 2012, Standish data showed improved results: 37% of projects succeeded (on time, on budget, with full scope), 42% were challenged, and 21% failed [2].

Recent (2020)

The latest CHAOS data shows renewed difficulties: only 31% of projects were “successful” [3]. Fully 50% were challenged and 19% failed [3]. Small projects performed far better (~90% success), while large projects had <10% success [3].

Global Outcomes

Across all regions, approximately 30–34% of projects meet all goals [3]. Cancellations dropped from ~31% in 1994 to ~19–21% in 2020. In 1994, successful projects in large firms delivered only ~42% of planned features [1]; by 2012, full-scope delivery was expected as part of success [2].

U.S.-Specific Figures

Standish surveys include many U.S. firms. In 2020, 31% of U.S. projects were canceled, and 53% were challenged – implying only ~16% succeeded [3]. Government IT projects fare worse:

Only 13% of major U.S. state and local IT projects succeed [4].

Only 13% of large federal IT procurements (>$6M) succeed [5].

Europe and Other Regions

Standish doesn’t regularly publish EU- or Asia-specific breakouts. However, regional reviews suggest similar trends:

A European analysis found 30% of projects succeed and 20% fail outright [6].

Summary Table

Region / Year On Time/On Budget (Success) Within Budget Meeting Scope Canceled (Failure)
Global (1994) 16.2% 16.2% ~42% of features 31.1%
Global (2012) 37% 37% 37% 21%
Global (2020) 31% 31% 31% 19%
U.S. Projects (2020) ~16% ~16% ~16% 31%
U.S. Gov't IT (2019) 13% 13% 13% 87%

Note: 1994 scope data approximates features delivered. 2020 U.S. figures inferred from reported challenge/failure rates.

Sources

  1. Standish Group CHAOS Report 1994
  2. InfoQ: CHAOS Manifesto 2012 Summary
  3. CHAOS Report 2020 (Standish Group)
  4. 18F: Why Government Digital Services Fail
  5. Belfer Center: IT Failures in Government
  6. ResearchGate: Project Failure Rate in IT Sector