Steven Stengel: Difference between revisions

From OpenCommons
Jump to navigation Jump to search
Created page with "{{Person |portrait=Stephen Stengel.jpeg |firstname=Steven |middlename= |lastname=Stengel |company=NextEra Energy Resources |position=Director, Communication |location=North Pa..."
 
No edit summary
 
Line 1: Line 1:
{{Person |portrait=Stephen Stengel.jpeg |firstname=Steven |middlename= |lastname=Stengel |company=NextEra Energy Resources |position=Director, Communication |location=North Palm Beach FL |country=United States |sector=Transportation, Utility |linkedin=https://www.linkedin.com/in/steve-stengel-66382028/ }}
{{Person
|portrait=Stephen Stengel.jpeg
|firstname=Steven
|lastname=Stengel
|company=NextEra Energy Resources
|position=Director, Communication
|location=North Palm Beach FL
|country=United States
|sector=Transportation, Utility
|linkedin=https://www.linkedin.com/in/steve-stengel-66382028/
}}

Latest revision as of 06:55, April 30, 2022



Resume
[[File:|190px]]
Steven Stengel
Name Steven Stengel
Company NextEra Energy Resources
Company Position Director, Communication
City, State North Palm Beach FL
Country United States
Sectors Transportation
Utility
Consulting: {{{skill}}}





Press

Charging Infrastructure For Commercial Vehicles
Daimler Truck North America LLC (DTNA), NextEra Energy Resources, LLC and BlackRock Renewable Power (BlackRock) today announced that they have signed a Memorandum of Understanding (MOU) to lay the foundation for a proposed joint venture (JV) to design, develop, install and operate a nationwide, high-performance charging network for medium- and heavy-duty battery electric and hydrogen fuel cell vehicles in the U.S. With the goal of accelerating the rollout of carbon-neutral freight transportation, start of operations for the future JV is planned for 2022. Initial funding is expected to be comprised of approximately $650 million divided equally among the three parties.